Discover the Ideas Embassies campaign!

Ecological Connectivity Study

An ecological connectivity study assesses a project's effect on wildlife movement and habitat fragmentation across the territory. At Ideas Medioambientales we carry it out using landscape permeability modelling, with particular attention to the cumulative effect of neighbouring wind and solar farms, for developers across Spain.

What an ecological connectivity study is

An ecological connectivity study assesses the degree to which a territory allows wildlife to move and flora to disperse between different population cores or habitat areas, and evaluates a project's effect on that connectivity. It is increasingly required in the environmental impact assessment of renewable energy projects and linear infrastructure, since the barrier effect and habitat fragmentation are cumulative impacts of growing relevance across the Spanish territory.

Why it matters

Ecological connectivity enables gene flow between wildlife populations, helps species adapt to climate change by moving towards newly favourable areas, and maintains essential ecological processes such as seed dispersal and seasonal migration. The proliferation of linear infrastructure and of wind and solar farms across the territory generates a cumulative fragmentation effect that is receiving ever greater scrutiny from environmental authorities.

Methodology

  1. Identification of existing ecological corridors within the study area, based on official cartography and connectivity models (landscape resistance analysis, circuit-theory models).
  2. Selection of focal species representative of different functional groups (large mammals, mesocarnivores, amphibians) for the connectivity analysis.
  3. Landscape permeability modelling before and after project implementation, identifying the barrier effect generated.
  4. Cumulative impact analysis, taking into account other infrastructure existing or under processing within the same ecological corridor.
  5. Proposal of measures: wildlife crossings, keeping corridors free of installations, permeability of perimeter fencing, connectivity restoration measures.

Relevance for solar projects

The cumulative effect of multiple fenced solar farms within the same district can generate significant habitat fragmentation for terrestrial species with limited mobility (such as rabbits or certain reptiles), even where each individual project has an apparently minor impact. A connectivity study makes it possible to anticipate this cumulative effect and to propose measures such as fencing permeable to certain species or maintaining free corridors between neighbouring farms.

Regulatory framework

Under Spanish and EU law, the assessment of the barrier effect and habitat fragmentation forms part of the environmental impact assessment procedure (Spanish Law 21/2013 on environmental assessment) and connects with the objectives of ecological connectivity and green infrastructure set out in Spanish and EU biodiversity policy, including the Natura 2000 network.

Why choose Ideas Medioambientales

We carry out ecological connectivity studies with landscape permeability modelling, integrated into the Environmental Impact Study of renewable energy projects and linear infrastructure, with particular attention to the cumulative effect where multiple projects lie close together within the same corridor. Our in-house team combines wildlife biologists with GIS specialists, with more than 25 years of experience across Spain.

Tell us about your project and its surroundings and we will advise whether you need a connectivity study and what scope it should have.

Book a 30-minute meeting and tell us about your projects.

You can also contact us today to talk about your project.

What can we cover in 30 minutes?

It's more than enough time to have an overview of your needs and recommend the best route forward. Here there is a summary of the steps we will follow.

1. Let's get to know your project

We want you to walk us through your project's main goals and concerns; and based on that, we’ll set an approach to make the most of the meeting.

2. Quick assessment: identifying challenges and opportunities

We will analyze the key aspects of your project, such as its location, applicable regulations, deadlines and potential environmental impacts, highlighting the main challenges and opportunities.

3. Tailored solutions: how can we help you

We will suggest you the services that best suit your needs, explaining how we work to ensure regulatory compliance and sustainability, while answering any questions that you may have.

4. Action Plan: let's keep moving forward together

We will wrap up with a summary of the key points, suggesting clear next steps such as a quote or a follow-up meeting. We will remain at your disposal to accompany you as your project moves forward.