Repowering of the 49.5 MW Molar de Molinar wind farm and evacuation infrastructure
2024

Archaeology

Biodiversity

Evaluation
Customer
Iberdrola Renovables Castilla-La Mancha S.A.
Localization
Alcadozo and Peñas de San Pedro (Albacete)

The first wind farm repowering project with a positive Environmental Impact Statement in Castilla-La Mancha
Environmental and archaeological assessment for the repowering of the existing Molar del Molinar Wind Farm, consisting of the decommissioning of the current wind farm and the construction of a new one, significantly reducing the number of wind turbines while largely utilizing the existing roads and trenches. Favorable Environmental Impact Statement published in the DOCM on November 19, 2024.
https://docm.jccm.es/docm/descargarArchivo.do?ruta=2024/11/15/pdf/2024_9012.pdf&tipo=rutaDocm

Otras áreas de experiencia
Join the tribe. Work at Ideas Medioambientales.
An exciting opportunity in environmental consulting. Work on inspiring projects that have a positive impact on the environment and sustainability. Join the team and be part of the change.


