Discover the Ideas Embassies campaign!

Control and Supervision of Impact on Historical-Artistic and Archaeological Heritage during the construction of the N-322 road from Córdoba to Valencia. Section: Fuentealbilla Bypass (KP 397.0 to 403.7) in Fuentealbilla (Albacete)

2009-2010
Archaeology
Customer
Copisa
Localization
Fuentealbilla (Albacete)
Documentation of heritage elements and archaeological excavation at an Iberian-era settlement.

The project involved the construction of an 8.5-kilometer bypass road from kilometer point 397 to the eastern connection with the future Casas Ibáñez bypass at kilometer point 403.7. Additionally, the section included 10 structures (2 viaducts, 5 overpasses, and 3 underpasses) and 2 interchanges allowing for all traffic movements: the Fuentealbilla West Interchange and the interchange with the B-8 road to Villamalea.

In More information you will find a case study on the impact on historical heritage. The N-322 bypass in Fuentealbilla, Albacete)

Otras áreas de experiencia

Join the tribe. Work at Ideas Medioambientales.

An exciting opportunity in environmental consulting. Work on inspiring projects that have a positive impact on the environment and sustainability. Join the team and be part of the change.